please find attached the preliminary loading conditions for launching with and without deckhouse.
Based on a lightweight for ready vessel of 11000t I have prepared two launching conditions:
- Launching condition with deckhouse
- Launching condition without deckhouse
To 1. The lightweight (11000t) was reduced by following weights, that are not on board during launching, for my opinion:
- crane equipment above wing section
- life saving equipment
- hatch covers
- furniture in deckhouse
- fillings in systems
- tween deck panels are no lightweight but also not considered
The lightweight is under this condition appr. 8900t.
To 2. The lightweight (11000t) was reduced by following weights, that are not on board during launching, for my opinion:
- complete deckhouse (incl. steel, outfitting, equipment, paint, ventilation, cable etc.)
- crane equipment above wing section
- provision cranes
- life saving equipment
- hatch covers
- fillings in systems
- tween deck panels are no lightweight but also not considered
The lightweight is under this condition appr. 8200t.
An acceptable lightweight distribution is currently not available because the steelweight is currently not divided into the individual sections.
Best regards